National Security Administration Fort Meade

admin November 8, 2020 Leave a reply

National Security Administration (NSA) Renovate Serverland Room 2 at Fort George G. Meade

Meltech completed this important project for the National Security Administration for the renovation of the Serverland Room 2 at Fort George G. Meade in Fort Meade, Maryland. This project was for the National Security Administration Upgrade Infrastructure in Serverland Room 2. The work includes the following and all incidental related work: Convert Machine Room to Lab Room including demolition of select existing systems, retention and reuse of other existing systems, and installation of new architectural, mechanical, and electrical and fire protection systems/equipment. The work was conducted in a single phase. Work in this phase was required to be substantially complete and ready for occupancy within 210 calendar days after No-tice to proceed.

Major products and systems include the following:

  1. Reuse existing architectural components (walls, raised access floor grid, and acoustical tile ceilings.)
  2. Reuse resisting “house” mechanical system (overhead air distribution.)
  3. Modify chilled water distribution.
  4. New chilled water computer room air conditioning (CRAC) units.
  5. Modify existing lighting system,
  6. New power distribution to server racks and cooling equipment.
  7. Modify existing fire suppression/alarm systems.

 

GSA US Secret Service

admin November 8, 2020 Leave a reply

GSA PBS OOA Capital Construction Division, Center 2 United States Secret Service (USSS) 9th Floor PID RMB SCIF Renovation in Washington, DC

Meltech completed this important project for the General Services Administration (GSA) Public Building Services (PBS) OOA Capital Construction Division for the United States Secret Services (USSS) Special Project with details limited. This project was for a design-bid-build renovation that included demolition, new office construction, finishes – floors, ceiling, doors, walls, electrical, HVAC, fire alarm, communications, electronic safety and security work.

GSA St. Elizabeth’s Hospital

admin November 8, 2020 Leave a reply

General Services Administration (GSA), DCO, DSCM & Base NCR Reconfiguration, United States Coast Guard (USCG) Munro Building 50 at the St. Elizabeth’s Hospital in Washington, DC

Meltech completed this important project for the U.S. Coast Guard at the Douglas A. Munro Building 50 at the St. Elizabeth’s Hospital in Washington, DC. 

The Saint Elizabeth’s West Campus is the stewardship of the General Services Administration, Potomac Service Center. The entire St. Elizabeth’s site (including both the West Campus and East Campus) has been designated a national historic landmark. The property is in the process of renovation and will become the headquarters for the Department of Homeland Security. This project was located at the USCG Bldg. 50 Munro Bldg. which is being redesigned to meet the minimum space requirements of the USCG. 

This project was for the USCG requirement for reorganization of the space as they have picked up an additional Flag Officer. In order to accommodate the square footage requirements for their positions USCG has to relocate the BNCR-HQ within the existing space. 

Meltech completed this project constructed for the Senior Supervisory position (with ranks of Command Master Chief, Commander, Captain, or GS-15) with the exception of the 3K16-02 in Suite 3K16-00. This office is for a Component Head Admiral. The project was completed during normal work hours in a fully occupied building. The project included upgrades to lighting, HVAC, receptacles, IT pathways, sprinkler and fire alarm system.