Walter Reed National Military Medical Center Tranquil Hall

admin November 8, 2020 Leave a reply

NAVFAC Walter Reed National Military Medical Center Building 62 Tranquil Hall Living Suites

The project was for interior construction, interior finishes, plumbing and selective building demolition. The project was to provide replacement ABA/ADA plumbing fixtures in Building 62 Tranquil Hall Movie Room and Gathering Place Austin’s Playroom Lobby & Warrior Café and living suites, bathrooms and at Walter Reed National Military Medical Center in Bethesda, Maryland. The work was performed on the 3rd floor basement, 2nd floor basement, 1st floor basement, and 1st floor levels.

The project required that a barrier-free design be installed in accordance with the requirements of the Federal Accessibility Standards (UFAS) as required by 42 U.S.C. 4151-4157, Architectural Barriers Act (ABA) of 1968, and consistent with 29 U.S.C. 794, Rehabilitation Act of 1973, but also had to meet the requirements of the Americans with Disabilities Act Accessibility Guidelines (ADAAG).

The fixture replacements included:

  • Removal and replacement of 35 shower/tub units
  • Removal and replacement of 153 kitchen sink faucets
  • Removal and replacement of 306 handheld shower heads (including stainless steel hoses)
  • Furnish and install 153 bidet toilet seats and associated plumbing and electrical GFI outlets to existing spare breakers (this will be installed by surface mounting plumbing and electrical inside laundry room)

Walter Reed National Military Medical Center Steam Lines

admin November 8, 2020 Leave a reply

NAVFAC Replace Steam & Condensate Piping at Walter Reed National Military Medical Center in Bethesda, Maryland

General Synopsis

Meltech completed this project for the Naval Facilities Engineering Command Washington at the Walter Reed National Military Medical Center in Bethesda, Maryland. This project was for the replacement of the steam and condensate piping to Buildings 11, 13, 14 and 20.

The project consisted of replacing the steam and condensate piping to Buildings 11, 13, 14 & 20 for the Naval Facilities Engineering Command Washington at the Walter Reed National Military Medical Center in Bethesda, Maryland. The project consisted of replacement of direct buried steam and condensate piping between Utility Tunnel # 5 and the Building 14 Mechanical Room along a partially new alignment and the replacement of steam and condensate piping between Building 16 and Buildings 11 and 27 along the existing Loop # 4 alignment through Manhole STML3504 and a new alignment from Manhole STML3504 to Buildings 11 and 27. The work also included the addition of a manhole to serve future Building 13 and building 20 renovations and the replacement of the Building 27 Manhole STML0304. Sequencing was required to cross connect exiting Loop #4 and Loop #7 in the basement of Building 17 prior to the start of demolition to maintain steam to buildings downstream of Manhole STML1304 during construction. The work was directly completed for Buildings 11, 13, 14 & 20 however the work was located between Buildings 14, 16, 17, 27 and 11.

Further Details

The project started with the goetech and retaining wall engineering and MOT, SCE, AGIP, SSF and portable sediment tank installation. Meltech completed the following:

  • Demolition of existing steam lines
  • Supplied, fitted and insulated approximately 340′  of 5″ SCH  40,  543′  of  3″ SCH  40  and  83′  of  2″  SCH40   black  Multi-Therm 500  direct  buried Steam pipe,
  • Supplied, fitted and insulated approximately 340′  of 3″ SCH 10 and 612′ of 3″ SCH   10 stainless Multi-Therm 500  direct  buried  condensate pipe,
  • Supplied, fitted manhole  0904 insulation of new pipe with 2″ insulation and aluminum jacket,
  • Supplied and fitted manhole  3504, new manhold North, new manhole South, Building 14, Building 11, Building 17, Building 27 insulation of new pipe with 2″ insulation  and aluminum jacket,
  • Building   27  interior  connections  to  new  steam   and  condensate lines exclude  any isolating flanges, scales pockets, condensate drain lines, shut off  valves,  check valves,  steam traps, etc. 
  • Provided   sump   pump  unit  for  new  north  and  south manhole and up to 40′ of 2″ piping to closest storm drainage     
  • Access  ladders  for  new  north  manhole,  south manhole and 3504 man holes includes vents and vent caps for new north and south manholes
  • Shop drawing  for buried pipe system (provided  by pipe manufacture)
  • Shop drawings for pipe system located in Mechanical rooms of building 11 and 14 where applicable.
  • Opening up of  valve  in  manhole   1104  after  work  in  building   11  and  17 
  • Replaced Sidewalk and Curb where demoed and Flag Pole Foundation
  • Repaired Spalding Concrete Manhole
  • Reinstallation of the Bike Rack, paving where demo’d, retaining wall across from Bldg. 17 that was demo’d and seeding and mulching of all disturbed areas.

Additional services performed included the geotechnical, concrete thermostat blocks and kickers, provided As-Built Drawings, performed the excavation and removal, welding inspections, imported the backfill materials for utilities, provided landscaping, test pits, sediment and erosion control, installation of temporary construction fence and temporary ADA compliant sidewalks, cathodic protection, sump pump installation and demolition and reinstallation of minor electric.

The main aspects of the work were:

  • Furnishing, installing and insulating approximately 340 feet of 5-inch SCH 40, 543 feet of 3-inch SCH 40, and 83 feet of 2-inch SCH 40 black Multi-Therm 500direct buried steam pipe.
  • Furnishing, installing and insulating approximately 340 feet of 3-inch SCH 10 and 612 feet of 3-inch SCH 10 stainless steel Multi-Therm 500direct buried condensate pipe.
  • Furnishing and installing a number of items, as shown on diagrams, in about one dozen manholes. All new piping to be insulated with 2 inches of insulation and aluminum jacket.
  • Furnishing and installing in Buildings 11, 13, and 14 a number of items as specified in the plans. All new piping to be insulated with 2 inches of insulation and aluminum jacket. Building 11 contained a condensate return unit.
  • Demolition of existing steam and condensate lines.
  • Connections included isolating flanges, scales pockets, condensate drain lines, shut-off valves, check valves, steam traps, etc.
  • Provide sump pumps for identifies units and up to 40 feet of piping to nearest storm drains
  • Provide access ladders, vents and vent caps for identified (on plans) manholes
  • Provide shop drawings for buried pipe system and for pipe systems located in mechanical rooms of Buildings 11 and 14
  • Maintaining strict adherence to, and “paper trail” for compliance with, the American made Act for all steel, pipe, carbon fittings, carbon valves
  • Demolition of asphalt curb and sidewalk covering areas with lines
  • Excavation the areas to install new lines
  • Demolition of old lines
  • Installation of new steam and condensate lines
  • Backfilling of trenches, installation of stone, replacing asphalt, concrete sidewalks and curbs.
  • Supplying Maintenance of Traffic for all operations including road plates
  • Excavation of areas for, and installation of, cathodic protection on newly emplaced lines
  • Final stabilization on excavated area including seed and mulch

Initial activities included:

  • Set up of erosion and sediment controls including super silt fence
  • Set up of temporary construction fence, orange safety fence, and tree-protection fence
  • Provision of portable sediment tank and dumpster
  • At-grade storm drain inlet protection
  • Geotechnical testing

In addition there was demolition of an existing site retaining wall, and subsequent replacement of the wall (concrete wall, 7 feet high) plus provision of 30 inch wide wooden walkways.

Related work included:

  • Demolition of then-existing site retaining wall across from Building 17 and subsequent re-installation
  • Removal of flag pole with crane and subsequent reinstallation
  • Demolition of flag pole base and replacement with new base
  • Demolition of five existing light poles and associated equipment
  • New foundation and concrete for five existing light pole bases
  • Removal of bike rack, then reinstallation
  • Demolition of asphalt, curb, paving and sidewalk as appropriate with saw cutting included, and subsequent replacement
  • Supplying Maintenance of Traffic for all operations including steel road plates
  • Demolition of five trees and root pruning of two others, plus demolition of a number of bushes
  • Replacement of bushes
  • Protection of trees
  • Seeding and mulching
  • Set up of erosion and sediment controls including super silt fence
  • Set up of temporary construction fence, orange safety fence, and tree-protection fence
  • Provision of portable sediment tank and dumpster
  • At-grade storm drain inlet protection

Walter Reed National Military Medical Center Larsons Gym

admin November 8, 2020 Leave a reply

NAVFAC Walter Reed National Military Medical Center Convert Part of Warehouse Building 226 to Auxillary Gym in Bethesda, Maryland

Meltech completed this important project for the Naval Facilities Engineering Command Washington for the conversion of part of Building 226 warehouse to an auxillary gym. This work was completed at the Walter Reed National Military Medical Center in Bethesda, Maryland.

The work consisted of the construction of interior partition walls approximately 175ft total length approximately 10.5’ high with 2×8 blocking to the north side of the existing center beam. This reduced the 50% footprint. One wall double sided approximately 40 feet in length with unfinished plywood creating a partition wall off the center of the building running east to west. The west wall was approximately 50 feet in length finished one side with unfinished plywood. The north wall approximately 24 feet in length to the light switch by the door with unfinished plywood, and the east wall from the partition wall approximately 21 feet in length to the roolup door. All plywood to be ¾” tongue and groove subfloor grade.

Meltech completed the relocation of the existing condensate drain line from the AC unit approximately 6 inches towards the rear of the building to provide clearance for the wall construction.

Meltech purchased and installed approximately 2,00 sf of interlocking rubber, “Locktuff”, flooring, minimum of ¾’ thick. Flooring was removable. The flooring installed must be able to be removed at a later date.

Fort Belvoir Design Build HAZMAT Facility

admin November 8, 2020 Leave a reply

US Army Corps Alterations and Repairs to Building 1495 HAZMAT Facility in Fort Belvoir, Virginia

This project was for the design and build-out of historical Building 1495 HAZMAT Facility in Fort Belvoir, Virginia. The work included the removal and replacement of the existing metal sheathing, metal wall panels, the replacement of existing windows and the installation of high efficiency heat pump systems. 

The project Exterior work included the removal of all existing sheathing including louvers on west side of facility; replacement of existing exterior metal wall panels; replacement of existing windows and replacement of one double door on east side with new window. All windows were to be double pane, argon gas filled, with low-e coating. The exterior work also included the replacement of exterior entry doors / frames; replacement of roll up doors / frames; replacement of gutters and downspouts; provided exterior LED facility lighting (wallpacks) with auto sensors and programmable time clocks. 

Site work included the installation of new automatic perimeter entry gate the end of perimeter fence and the installation of a culvert, suitable fill and asphalt to create new entry to facility. 

Interior Demolition consisted of the removal of all existing equipment including oil boiler, air handler, existing duct system, exterior air condition unit, warehouse space heaters and controls and the disconnection of the heating oil tank. The interior demolition work also included the removal of existing drop ceilings, light fixtures, wall finishes, and floor finishes in the administration portion of the facility. 

The HVAC work included the installation of high efficiency heat pump system with associated duct work for administrative area. Meltech provided new unit heaters in warehouse. New system was installed in compliance with NFPA 30 for use in a HAZMAT Facility. Meltech coordinated this work with the Washington Gas Company for the extension of the gas line to the building and any associated work. We air sealed the mechanical room, exhaust duct / fan with duct mastic to eliminate air leakage into the administration area and completed the replacement of two exhaust fans in the warehouse. 

Fire Alarm/Suppression System work included the installation of new addressable fire alarm system and modification to existing water sprinkler system to provide coverage of administrative area. The work also included the installation of new foam based system suitable for hazardous material storage facility for coverage of warehouse portion of facility. 

Electrical work consisted of the assessment of all electrical service panels for capacity to receive new load from HVAC equipment and provide sufficient space capacity. Panel repairs and wiring completed where needed. Work also included the replacement of electrical outlets and switches in warehouse with fixtures compliant with NFPA 70 class 1 Division 2 Material Storage Areas; reconfiguration of electrical outlets and switches according to new floor plans in administrative area; replacement of existing warehouse area fluorescent lights with high efficiency fluorescent fixtures with electronic ballasts and individual motion sensors. Light locations same as existing and the replacement of existing administrative area fluorescent lights with interior LED lights. 

Architectural work consisted of the reconfiguration of interior partitions based on new space plan provided. Final space dimensions were coordinated with end user; exterior wall in administrative space were insulated to the maximum extent possible. Walls furred out where necessary. The work included the replacement of the interior doors/frames; installation of approximately 8 foot base cabinet run in office with sink and laminate countertops. The work also included the replacement of the existing floors with new VCT in the administrative space; painted all administrative area and restroom walls including partition wall with warehouse (both sides) and the replacement of restroom stall partitions and installation of floor ceramic tile. 

Plumbing work included the replacement of all restroom fixtures including toilets, sinks, faucets, urinals and showers and provided the renovation of all restrooms to meet current applicable plumbing and ADA codes. Meltech provided and installed two frost-proof hose bibs to the South and North sides of building and access to the plumbing in bathroom for the potential waste and water connections for sink in the office with sink and laminate countertops. The work was coordinated with end user to for color and material selections. Meltech also provided a single use female restroom with all required plumbing fixtures and accessories. 

Warehouse work included the installation of a perimeter containment system within the warehouse portion of the facility utilizing a 6inch high concrete berm along majority of the facility perimeter, concrete berms in front of the rollup doors, and trench drains in front of access doors; paint the floor coating in entire warehouse area; installation of durable marking tape on the floor to delineate different storage areas of the warehouse; installation of additional eye wash into warehouse area; replacement of rusted sheet metal cladding throughout interior of building. The work included the redesign of the access gate. Meltech provided and installed 80’ of commercial grade steel pallet racks inside the warehouse for equipment and material storage, capable of accepting a 4’x4’ pallet with 55 gallon drum on bottom and top levels. 

The Communications work included the reconfiguration of communication wiring and data and phone terminals to conform to new floor plans. The work required that a minimum of 8 data / phone terminals. Meltech also installed jumper to wall mounted computer display. We designed cable runs and drop locations and installed cable trays. Meltech purchased and installed prefabricated hazardous storage material containers and placed them outside the building while the renovation was ongoing. The hazardous storage material containers were returned inside the building upon completion of the project. 

Polychlorinated Biphenyl (PCB) Cleanup – The Fort Belvoir Directorate of Public Works (DPW) Environmental and Natural Resources (ENRD) are responsible for ensuring compliance with all applicable environmental regulations. Meltech was required to obtain a DPW Excavation Permit (subsurface utility clearance) from the DPW-Construction Management Division prior to all activities requiring any excavation or other subsurface work. A very large portion of this contract was for remedial work for the Polychlorinated Biphenyl (PCB) cleanup. The affected areas of concrete and soil were returned to original condition. Clean soils were placed into the area, and compacted to 95% ASTM D-698 compaction. New asphalt was placed atop the compacted areas and covered completed to allow vehicles to drive over it. It was required to be strong enough for large, heavy, equipment and trucks to safely drive over. 

Sustainable Design Elements 

The contract had several sustainability design requirements to be met. All mechanical, lighting, windows, roofing systems, wall insulations, utility meters, hot water heaters, interior plumbing fixtures, outdoor water, paint adhesives, and sealants and carpet to meet the current Department of Energy Purchasing Specifications for Energy Efficient Products listed on the Federal Energy Management Program, Sheet Metal and Air Conditioning Contractor’s National Association Indoor Air Quality Guidelines for Occupied  Buildings under Construction, 1995, Energy Star or FEJ\1P (Federal Energy Management  Program) ratings, Energy Standard for Buildings except Low-Rise Residential, International Energy Conservation Code, State of Virginia Ia 9 VAC 5-40 Emission Standard for Architectural  and Industrial Maintenance Coating (Rule 4-49) and Carpet and Rug Institute  Green Label program.